Information and Analysis Center
for Positioning, Navigation and Timing
РУС
ENG
Main
GLONASS
GLONASS SCC
GLONASS status
Ephemeris
Monitoring
Daily monitoring
Visibility zone calculation
Integral availability
Instant availability
Coordinates refinement (RINEX)
Evaluation of characteristics
System documents
BEIDOU
BEIDOU status
BEIDOU almanac
User performance
Russia-China Committee
GPS
GPS status
GPS almanac
Real-Time GPS monitoring
Evaluation of characteristics
News
Archive
Review
IAC
IGS
IERS
ILRS
FAF
MAIL
GENERAL
HETCES
REPORTS
Guide
GLONASS history
Navigation principles
BEIDOU
FAQ
Navigation equipment
Links
Maps
Feedback
Feedback
Report a problem
About IAC
About IAC
The Northern Sea Route 2011
The Silk Road Experiment
18.11.2019
According to GLONASS System Control Centre, the SC Glonass-M #731 (orbital slot 22) set unusable due to the planed maintenance works from 16.11.2019 05:32 (MT) till 25.11.2019 00:00 (MT)
Back to the list