13.03.2012

According to GLONASS System Control Centre possible breaks in SC Glonass-M №715 (14 orbital slot) operation are expected 16.03.2012 from 09:40 till 11:12 (MT) and 20.03.2012 from 13:10 till 14:31 (MT) due to the scheduled works

According to GLONASS System Control Centre possible breaks in  SC Glonass-M №715 (14 orbital slot) operation are expected  16.03.2012  from 09:40 till 11:12 (MT) and 20.03.2012 from 13:10 till 14:31 (MT) due to the  scheduled works.

Back to the list