06.01.2013

According to GLONASS System Control Centre from 01:00 06.01.13 (MT) till 12:35 15.02.13 (MT) experimental work will be conducted with SC Glonass-K #701 (in flight tests phase). In the almanac Glonass-K #701 will be designated under system number 8


Back to the list